Strategy 03 · Dual occupancy
Dual occupancy:
two homes, one title.
Land bought specifically for a pair. Two dwellings built together, sharing the one site, the one set of site costs and the one approval, held for two rents or sold down when complete.
How it works
Dual occupancy is a consent question before it is a build question. Whether two dwellings are permitted on the block, and how they must sit, depends on the zone, the lot size, the frontage and the local planning rules, including parking and private open space.
Once the consent is in hand the build runs as one project: one set of site costs, one scaffold, one supervisor, one trade sequence. That is the whole economic case for building a pair rather than a single house on the same land.
Both dwellings are separately metered and separately tenanted. A pair in a solid rental market usually beats a single house on yield, and it leaves the option to strata title and sell one side down later.
The numbers
- Typical land and build
- $1.3m to $1.6m all in
- Approval route
- Dual occupancy consent, development application
- Consent to keys
- 6 to 9 months consent, then 6 to 8 months to build
- Rent per dwelling
- $850 to $1,100 a week
- Site needed
- Lot size, frontage and zone that permit two dwellings
- Title
- One title, strata possible later
Indicative figures only. Every site is priced on its own controls, services and costs.
How the project runs
Four steps, one team.
Find land that allows it
Zone, minimum lot size, frontage, access and services. We only bid on blocks where two dwellings are permitted, not where they might be.
Lodge the consent
Architect, planner and engineer prepare the pair. The development application is lodged with the same due diligence pack the bank sees.
Build as one project
Two dwellings framed together, one site set up, one construction schedule. Shared site costs are where the project makes its money.
Lease both sides
Separate metering, separate tenancies, certification signed off, and both dwellings loaded into 365 Metrics.
Questions
What people ask us first.
Dual occupancy is the planning term for two dwellings on one lot. A duplex is how they are usually built, side by side or one behind the other. If the pair is later subdivided or strata titled, each dwelling ends up on its own title.
See how it runsBudget $860,000 to $1m for the pair, plus land at $580,000 to $720,000 in most of the areas we work, plus approvals and connections. Site conditions such as slope, retaining, sewer relocation and driveway length move the build figure more than the finishes do.
See worked duplexesYes, once a strata or torrens title subdivision is registered. That is a second approval on top of the dual occupancy consent, so it is priced and modelled before the build starts rather than discovered afterwards.
Talk through the optionsSeparate power, water and, where the tenancies are separate, separate metering. It is a small line in the budget that decides whether both sides can be tenanted independently, so it is designed in rather than retrofitted.
Read the build stageSix to nine months for a dual occupancy consent in a straightforward case, then six to eight months to build. Where the block needs a variation or an adjoining owner objection, add time to the front end, not the build.
Read the processVacancy is checked before we buy: the rate for the postcode, the number of comparable rentals and the days on market. A pair of three bedroom dwellings in a family suburb lets differently to a pair of two bedroom units, so the layout follows the local demand.
See how it is testedOther ways to run it
Have a property or a block? Let's see what it can hold.
Send the address, house or land, and we will come back with the strategy that suits it, what it costs to deliver and what it earns.